Donatos.org> Bathroom Rehab

Bathroom Rehab

Previous Next
Page 6 of 7
DSC00631
DSC00631 - This is the strike before I took it out and cleaned it up.

DSC00631
DSC00632
DSC00632 - Trim around window.

DSC00632
DSC00633
DSC00633 - Floor is ready for tile.

DSC00633
DSC00635
DSC00635 - Another shot of the floor ready for tile.

DSC00635
DSC00636
DSC00636 - There was a tub under all that junk.

DSC00636
DSC00637
DSC00637 - Walls are ready for tile

DSC00637
DSC00638
DSC00638 - Progess shot of the tile.

DSC00638
DSC00639
DSC00639 - Progress shot of tile installation.

DSC00639
DSC00640
DSC00640 - The floor is set, no grout yet

DSC00640
DSC00641
DSC00641 - The floor is set, no grout yet

DSC00641
DSC00642
DSC00642 - The floor is set, no grout yet

DSC00642
DSC00643
DSC00643 - Mosiac is in.

DSC00643
DSC00644
DSC00644 - Mosiac.

DSC00644
DSC00645
DSC00645 - Tile is set, needs grout.

DSC00645
DSC00646
DSC00646 - Tile is set, needs grout. You can see the shelves in this one.

DSC00646
DSC00647
DSC00647 - Tile is set, needs grout.

DSC00647
DSC00648
DSC00648 - Tile is set, needs grout. This is the base moulding.

DSC00648
DSC00649
DSC00649 - Tile is set, needs grout. Another shot of the base.

DSC00649
DSC00650
DSC00650 - Tile is grouted. Needs a quick wipe.

DSC00650
DSC00651
DSC00651 - Floor is grouted, needs to be wiped.

DSC00651
DSC00652
DSC00652 - Finished grout, needs wipe.

DSC00652
DSC00653
DSC00653 - Another floor shot, just after grouting.

DSC00653
DSC00655
DSC00655 - Tub is being refinished, this is the primer coat

DSC00655
DSC00656
DSC00656 - Finished product.

DSC00656
DSC00657
DSC00657 - Another shot of the tub after it was refinished.

DSC00657
1 2 3 4 5 6 7