Donatos.org> Bathroom Rehab

Bathroom Rehab

Previous Next
Page 5 of 7
DSC00584
DSC00584 - Drywall.

DSC00584
DSC00585
DSC00585 - More drywall.

DSC00585
DSC00586
DSC00586 - Drywall/durarock seam

DSC00586
DSC00587
DSC00587 - Durarock around the tub.

DSC00587
DSC00595
DSC00595 - Finished plumbing, ready for durarock.

DSC00595
DSC00596
DSC00596 - Shower spout.

DSC00596
DSC00597
DSC00597 - This is the 3/8" layer of plywood above the 3/4". This will bring the floor up high enough to meet up with the floor outside and the toilet flange.

DSC00597
DSC00600
DSC00600 - I had to remove the durarock that was previously installed to replace the edge nailer. This is the new nailer.

DSC00600
DSC00601
DSC00601 - This is the right side nailer I added. There was not enough room to screw the durarock in.

DSC00601
DSC00602
DSC00602 - Durarock finally finished the right way.

DSC00602
DSC00603
DSC00603 - Drywall, ready for mud/tape.

DSC00603
DSC00604
DSC00604 - Another shot of the durarock/drywall.

DSC00604
DSC00605
DSC00605 - Mud and tape is done.

DSC00605
DSC00606
DSC00606 - Mud and tape is done.

DSC00606
DSC00607
DSC00607 - Mud and tape is done.

DSC00607
DSC00608
DSC00608 - Mud and tape is done.

DSC00608
DSC00609
DSC00609 - Mud and tape is done.

DSC00609
DSC00610
DSC00610 - Mud and tape is done.

DSC00610
DSC00618
DSC00618 - Window trimmed, but not finished yet.

DSC00618
DSC00619
DSC00619 - Window trimmed, but not finished. I have to add some trim under the stool.

DSC00619
DSC00620
DSC00620 - Door trimmed but no caulk yet.

DSC00620
DSC00621
DSC00621 - Door trim.

DSC00621
DSC00624
DSC00624 - Fan bezel is installed.

DSC00624
DSC00626
DSC00626 - Switch plate cover installed.

DSC00626
DSC00627
DSC00627 - Switch plate cover again.

DSC00627
1 2 3 4 5 6 7